2006 - recent
Contract for "The Supply and Delivery of Prefab Manhole and Manhole Covers for Telekom Malaysia Berhad (TM)".
Contract No.: 3400015333
Contract for "The Supply and Delivery of Prefab Manhole under The Entrepreneurship Development Programme".
Contract No.: 46050035
Contract for "The Manufacture, Supply and Delivery of Pre-Stressed Spun Concrete Pole under Entrepreneurship Programme".
Proposed project to build and complete a Pahang Sports School and related facilities in district of Kuantan, Pahang Darul Makmur.
(Building Works)
Build a bridge over the Pahang River in Kuala Krau, Pahang Darul Makmur.
North-South Expressway Proposed Modification of Non-Stop Through Traffice between Jelapang (Package 5).
Job No.: PLUS/WU/UUD/0425/C1/05-013
Earthworks for the proposed construction of the Malaysian Sports School in Bandar Gambang, Mukim Kuantan, Pahang Darul Makmur for the Ministry of Education Malaysia.
Construction and completion of remaining loop road (Package 1E4) for the University Technology Petronas development at Bandar Seri Iskandar, Perak Darul Ridzuan.
Contract No.: C0N/11N/0248
Package No.: A2a/01E/LRD/C1E4
2000 - 2005
Upgrading of roads and multi-storey construction at the Taman Samudera Road Intersection and Small Entreprises in Batu Caves. (MRR2 - Phase 2).
Manufactures and supplies manholes on a contract basis.
Construction of hostel at SMK Jengka 2 and other related work in district of Maran, Pahang Darul Makmur.
Proposed to design, build and complete SMK Peramu Jaya, Pekan, Pahang Darul Makmur.
Construction and Completion of Technical Office Building (A220) for BASF Petronas Chemical Sdn. Bhd.
Build and complete the village road project in an integrated concept of the state of Pahang. (2002). No. Contract: KPLB / PJK / C / 138/02
Build and complete the village road project in an integrated concept of the state of Pahang. (2002). No. Contract: KPLB / PJK / C / 70/02
Build and complete an additional building 1 block of rooms and 1 block of Science Laboratory at Sekolah Menengah Lepar Hilir, Kuantan, Pahang.
Manufactures and supplies manholes on a contract basis.
Manufactures and supplies manholes on a contract basis.
Build and complete the village road project in an integrated concept of the state of Pahang. (2001). No. Contract: KPLB / PJK / C / 21/01
Centralised Utility Facilities Project: Buildings Work Package 2 at Kertih, Terengganu.
Kuantan-Kerteh Railway Project, Civil Works Package 2.
Construction and completion of Jalan Tualang Padang to Chenera and related works in Raub, Pahang.
Proposal to build and complete Sekolah Menengah Bukit Rangin, Kuantan, Pahang.
New bridge over the Railway at Lines 8, 64 and 87 (Package 3) at Jerantut Flyover, Pahang.
Project for MTBE Propane Dehydrogenation – Construction of Temporary Facilities & Road Works (Contract No: 1b-C006)
Centralised Utility Facilities Project: Building Works Package 1 di Gebeng, Kuantan, Pahang.
The Procurement, Construction and Commissioning of Natural Gas Pipeline Peninsular Gas Utilization Project Loop 2 (PGU Loop 2) – Concrete Set on Weight.
Proposed development of 15 units of Office Shops on Lot 86, Sec. 1 PN 3838, Mukim Luit, Bandar Maran, Pahang.
Build and complete works for the proposed Pahang Islamic College Permanent Campus, Phase 2 at KM 8, Jalan Kuantan - Gambang, Kuantan, Pahang.
1994 - 1999
General and Building for:
- PMU 132/11kv Mentakab, Pahang.
- PMU Kg. Awah, Pahang.
- PMU Genting Sempah, Pahang.
BPC Arcylics Complex – Training Centre and Canteen in Gebeng, Kuantan, Pahang.
Construction of 8″, 12″ and 36″ Bolt on Weights Peninsular Gas Utilization Project Loop 1 – Gas Transmission System.
Propane Dehydrogenation Project ITB No. 003 – Site Office and Fitting Shop.
BPC Acrylics Complex: Temporary Facilities in Gebeng, Kuantan, Pahang.
Work to repair the movement area of the RMAF Airport aircraft in Kuantan, Pahang.
Proposed expansion of Bandar Baru Maran for Maran District Council and Aima Rozz Group.
Works to repair roads, drains and works in Perumahan Desa Jaya, Bandar Pusat Jengka, Pahang Darul Makmur.
Proposed Work on the Repair and Upgrading of the Malaysian Parliament Building for the Official Ceremony of His Majesty the Yang Di-Pertuan Agong.
Special Program for the Maintenance of Health Buildings in the state of Pahang Darul Makmur. (C12b, C12e and C12g1 Packages).
Proposed Silt Digging Works in Sg. Klang starts from Tun Razak Bridge to Jalan Jelatek Bridge, Kuala Lumpur.
Supply and manufacture manhole contractually.
Proposed Road Paving Work & Road Maintenance in Kg. FELDA Bukit Sagu 2 & 3 (Package 5)